International Water Conference 2010

Power Industry, fuel Industry

The history of development of power engineering of Tajikistan starts with 1936.

This year the maiden waterpower plant Varzobskaya-1 by power 7,15 mWt was entered into a build (. under construction, formation).

The most intensive development the hydropower has received, since 60 years, from a beginning of building Nurek HPP.

To the end of the 80-th years the hydropower of republic has reached impressive outcomes. The development of the electric power per capita has grown up to 3000 kWs. The hours annually that are higher average European of a level. Thus, at the fare 1,0-1,1 cents for kilowatt a hour the general economical profit of a system averaged 95,88 million. dollars annually. With allowance for of amortization costs she was peer 136,23 million. dollars. If to eliminate from the cost price the economically not justified today costs of fuel for Heat electro central, the general profit of the Tajik power system will become equal 157,16 million. dollars, that corresponds to economical profitability 225%. And, at last, the profit alone hydro powers, that is without costs of the logistics electric power, was in the 80-th years peer on the average 227,12 million. dollars annually at profitability 800%.

An energy programmed USSR, designed in the beginning of the 90-th years, was planned the even greater development of power engineering of Tajikistan at the expense of building large HYDROELECTRIC STATION.

For 1991-2005 years this program envisioned input of new powers at a rate of 22,4 thousand MWt. With conforming by a gain of development 86,8 billion kWt/h Annually, that is 5-multiple development of a power system.

INVESTMENT PROJECT № 1

Name of the project: Modernization of hydroelectric power station - 1, hydroelectric power station - 2 of the stage of Varzob hydroelectric power station

Title of enterprise: OPEN HOLDING JOINT STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan, Dushanbe, 64 Ismoili Somoni street.

Telegraph: Dushanbe " Barki Tojik ", teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Field of activity: manufacture, transmission and distribution of thermal and electrical energy

The purpose of the project: improvement of manufacture, transmission and distribution of the electric power by an rehabilitation and modernization of the existing equipment.

The brief description of the project: For the modernization of the Varzob Stage the Hydroelectric Power Station - 1 it is necessary to exchange the turbine with the turbine type of HYDROELECTRIC POWER STATION - 1 PO 75/702. To establish the transformer TM-4000 кVА , 35/6 kV, to elaborate distance control of shields GU HYDROELECTRIC POWER STATION - 2.

On HYDROELECTRIC POWER STATION - 2: to exchange existing turbines such as PO 115/697, to construct automatic free - running drop. To exchange the existing transformer, to adjust steady and reliable operation of generators. To establish reactors concrete - copper on diverging lines of generating, second generator 25000 кVА on 110/35/10 kV, disk shutters.

Overall costs of the project:

(Million. US dollars) - 9,0

From them:

Own means:

The external investments - 9,0

The Proposal to investors:

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

The technical - economical substantiation.

Business - plan.

--------------------------------------------------------------------------------

INVESTMENT PROJECT № 2

Name of the project: Building of substation 220 кv "Shahrinav"

Title of firm: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " the teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Field of activity: manufacture, transmission and distribution of thermal and electrical energy

The purpose of the project: improvement of electrical power supply of Gissar Region.

The brief description of the project: For liquidation of a deficit in power junctions of Dushanbe, Shahrinav and Gissar regions it is necessary to build the new supporting PC 220 кV with two autotransformers on 125 thousand кVА each and one autotransformer

125 кVА

Overall costs of the project:

(million. US dollars) - 8,854

from them:

own means

the external investments -8,854

The proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

The technical - economical substantiation.

Business - plan.

--------------------------------------------------------------------------------

INVESTMENT PROJECT № 3

Name of the project: Modernization of Kayrakum hydroelectric power station

Title of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " the teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Field of activity: manufacture, transmission and distribution of thermal and electrical energy

The purpose of the project: increase of reliability of effecting, transmission and distribution of the electric power by modernization of the existing equipment of a hydropower plant.

The brief description of the project: To execute an estimation of residual resource of the hydraulic turbines which have fulfilled the normative service life. The replacement of power equipment, taking in to account the design features of the hydro unit, replacement of the runner, modernization of hydro generators with usage of new technology ОРУ, drainage pompes and compressors, replacement of oil and air circuit breakers is indispensable.

Overall costs of the project:

(million. US dollars) - 26,8

from them:

own means

the external investments -26,8

Proposal to investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

The technical - economical substantiation.

Business - plan.

--------------------------------------------------------------------------------

INVESTMENT PROJECT № 4

Name of the project: Modernization of the fall casting hydroelectric power station

Title of enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " the Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Field of activity: Manufacture, transmission and distribution of thermal and electrical energy

The purpose of the project: improvement of manufacture of the electric power by the modernization of the existing equipment.

The brief description of the project: modernization of hydraulic units No: 1, No: 2, No: 3. Replacement of accumulator batteries, compressors, rehabilitation of a piezometrian network on hydraulic engineering facilities, realization of shore strengthening activities on derivational channel.

Overall costs of the project:

(million. US dollars) - 16,2

from them:

own means

the external investments -16,2

Proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

The technical - economical substantiation.

Business - plan.

-------------------------------------------------------------------------------

INVESTMENT PROJECT № 5

Name of the project: Reconstruction of distributive electrical networks.

Title of enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " the Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Field of activity: manufacture, transmission and distribution of thermal and electrical energy

The purpose of the project: an improvement of the quality, reliability of transmission and distribution of the electric power.

The brief description of the project: the replacement of existing transformers on more powerful is indispensable in order to decrease the load of existing distributive electrical circuits networks. A rewiring (on the greater cross-section), bearings, disconnecting switches, disconnectors, single-switches, automatic control units, safety devices. Building of additional substations 6-10-20 / 0,4 sq.

Overall costs of the project:

(million. US dollars) - 70,0

from them:

own means

the external investments -70,0

The proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

The technical - economical substantiation.

Business - plan.

------------------------------------------------------------------------------

INVESTMENT PROJECT № 6

Name of the project: Reconstruction of a park of the count in a power system Open Holding Joint - Stock Company " Barki Tojik "

Title of firm: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " the Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Field of activity: manufacture, transmission and distribution of thermal and electrical energy

The purpose of the project: achievement of the qualitative calculation of the consumed electric power in a power system Open Holding Joint - Stock Company " Barki Tojik "

The brief description of the project: used devices for calculation of the electric power morally and physically have become outdated, as have a poor nonsufficient accuracy, create disculculation of consumed electric power, do not have the possibility of operating control of routine-limit discipline.

It is indispensable the full replacement of an existing park of devices of the calculation on modern electronic meters with absolute consistency for:

1. Intergovernmental cross flow of the electric power in quantity 66 pieces with an absolute consistency 0,2.

2. Development of diverging lines in quantity 135 pieces with an absolute consistency 0,5

3. Head count in quantity 300 pieces with an absolute consistency 0,5.

4. Interregional counting in quantity 280 pieces with an absolute consistency 1,0

5. Technical count in quantity 4500 pieces with an absolute consistency 1,0

Total 5281 pcs. of electric meters.

The application of electric meters demands partial replacement of measuring transformers of a current and voltage.

Simultaneously with it the conforming metrology equipment, computer means and communication facilities, and also replacement of electric meters for the household users which are most power-intensive are required.

Overall costs of the project:

(million. US dollars) - 15,04

from them:

own means

the external investments -15,04

The proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

The technical - economical substantiation.

Business - plan.

------------------------------------------------------------------------------

INVESTMENT PROJECT № 7

Name of the project: Construction of superconductive high voltage line- 765 Kw "Rogun-Khorog-Vakhan-Peshavar"

Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations.

The purpose of the project: Provide direct transmission of power energy from Rogunskaya HPS to Afghanistan and Pakistan.

The brief description of the project: Construction of superconductive HL-765 Kw., section 3*5 sq.mm, length-650 km; Rogunskaya HPS-Khorog-Vakhan- Peshavar will provide transmission of 700-800 thousand Kw. or 4.0 billion kw. to Afghanistan and Pakistan. The length from Rogunskaya HPS till Afghanistan-Pakistan frontier is 550 km.

Total costs of the project:

(million. US dollars) - 240,0

from them:

own means

the external investments - 240,0

term of repayment (year) - 10

The proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

Investment project.

Business - plan.

------------------------------------------------------------------------------

INVESTMENT PROJECT № 8

Name of the project: Construction of superconductive high voltage line- 500 Kw "Rogun-Kunduz-Puli Khumri-Kabul-Jalalabad-Peshavar"

Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations.

The purpose of the project: Provide direct transmission of power energy from Rogunskaya HPS to Afghanistan and Pakistan.

The brief description of the project: Construction of superconductive HL-500 Kw., section 3*400 sq.mm, length-1100 km: Rogunskaya HPS-Sangtudinskaya HPS - Kunduz, Puli Khumri -Kabul - Jalalabad (Afghanistan)-Peshavar (Pakistan) will provide transmission of 700-800 thousand Kw. or 4.0 billion kw. to Afghanistan and Pakistan. The length of the line from Rogunskaya HPS till Afghanistan-Pakistan frontier is 1000 km.

Total costs of the project:

(million. US dollars) - 295,5

from them:

own means

the external investments - 295,5

term of repayment (year) - 10

The proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

Investment project.

Business - plan.

-------------------------------------------------------------------------------

INVESTMENT PROJECT № 9

Name of the project: Construction of superconductive high voltage line- 500 Kw "Rogunskaya HPS- Sangtudinskaya HPS -Kunduz-Puli Khumri-Kabul"

Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations.

The purpose of the project: Provide direct transmission of power energy to large population areas of Afghanistan

The brief description of the project: Construction of superconductive HL-500 Kw, section 3*400 sq.mm, length- 585 km: Rogunskaya HPS-Sangtudinskaya HPS - Kunduz, Puli Khumri -Kabul will provide transmission of 700-800 thousand Kw or 4.0 billion kw. of energy from the Republic of Tajikistan to large population areas of Afghanistan.

Total costs of the project:

(million. US dollars) - 157,65

from them:

own means

the external investments - 157,65

term of repayment (year) - 10

The proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

Investment project.

Business - plan.

-------------------------------------------------------------------------------

INVESTMENT PROJECT № 10

Name of the project: Construction of superconductive high voltage line- 500 Kw "Rogun - Sangtuda -Kunduz-Puli Khumri-Kabul-Gerat- Meshed (Iran).

Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations.

The purpose of the project: Provide direct transmission of power energy to large population areas of Afghanistan and Iran.

The brief description of the project: Construction of superconductive HL-500 Kw, section 3*400 sq.mm, length- 1560 km: from Rogunskaya and Sangtudinskaya HPS till Kunduz, Puli Khumri -Kabul - Gerat - Meshed (Iran) will provide transmission of power energy from the Republic of Tajikistan to large population areas of Afghanistan and Iran.

Total costs of the project:

(million. US dollars) - 544,4

from them:

own means

the external investments - 544,4

term of repayment (year) - 10

The proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

Investment project.

Business - plan.

-------------------------------------------------------------------------------

INVESTMENT PROJECT № 11

Name of the project: Construction of high voltage line- 500 Kw "Rogun - Regar-Guzar -Karakul (Uzbekistan) - Charjou- Mari (Turkmenistan)- Meshed (Iran).

Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations.

The purpose of the project: Provide transmission of power energy from Republic of Tajikistan to the Islamic Republic of Iran.

The brief description of the project: Construction of HL-500 Kw, section 3*400 sq.mm, length-1310 km, including Rogun-Regar-160 km; Regar-Guzar-Karakul-Charjou- Mari-900 km; existing HL-500 kw, Mari- Meshed-250 km is for transmission of power energy from the Republic of Tajikistan to Islamic Republic of Iran.

Total costs of the project:

(million. US dollars) - 166,55

from them:

own means

the external investments - 166,55

term of repayment (year) - 10

The proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

Investment project.

Business - plan.

-------------------------------------------------------------------------------

INVESTMENT PROJECT № 12

Name of the project: Construction of superconductive high voltage line- 500 Kw "Rogunskaya HPS-Jirgital- Kyrgyzstan- China.

Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations.

The purpose of the project: Provide transmission of power energy from the Republic of Tajikistan to China and other countries.

The brief description of the project: Construction of HL-500 Kw, section 3*400 sq.mm, length-550 km. Rogunskaya HPS-Jirgital- Sari Tash (Kyrgyzstan) - Ulugchan (Chinese People's Republic) is for transmission of power energy from the Republic of Tajikistan to China and other countries.

Total costs of the project:

(million. US dollars) - 159,5

from them:

own means

the external investments - 159,5

term of repayment (year) - 10

The proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

Investment project.

Business - plan.

------------------------------------------------------------------------------

INVESTMENT PROJECT № 13

Name of the project: Construction of superconductive high voltage line- 500 Kw " Khujand-Datka- Osh (Kyrgyzstan) - Ulugchat (China).

Name of the enterprise: OPEN HOLDING JOINT - STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan,. Dushanbe, 64 Ismoili Somoni street

Telegraph: Dushanbe " Barki Tojik " Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of hydropower stations, power transmission lines, substations.

The purpose of the project: Provide transmission of power energy from the Republic of Tajikistan to China and other countries

The brief description of the project: Construction of HL-500 Kw, section 3*400 sq.mm, length-510 km. Khujand-Datka- Osh (Kyrgyzstan) - Ulugchan (CPR) is for transmission of power energy from the Republic of Tajikistan to China and other countries.

Total costs of the project:

(million. US dollars) - 193,51

from them:

own means

the external investments - 193,51

term of repayment (year) - 7

The proposal to the investors

Possible forms of co-operation:

Engaging of the investments by the way of credit

Document ground of the project:

Investment project.

Business - plan.

-----------------------------------------------------------------------------

INVESTMENT PROJECT 14

Name of the project: Construction of Shurobskaya HPS with capacity of 850 МW.

Title of enterprise: OPEN HOLDING JOINT STOCK COMPANY " BARKI TOJIK "

Address: 734026, Republic of Tajikistan, Dushanbe city, 64 Ismoili Somoni street.

Telegraph: Dushanbe " Barki Tojik ", Teletype: 201261 "Plamya"

Tel.: (992-37) 235-86-68, fax: (992-37) 235-86-92

E-mail: barki This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Field of activity: Manufacture, transmission and distribution of thermal and electrical energy. Design and construction of Hydroelectric Power Stations, power transmission lines, substations.

The purpose of the project: Manufacture of electric power for further export to other countries.

The brief description of the project: Working out of technical project of Rogunskiy hydro- control structure proved the necessity to construct Shurobskaya HPS to optimize work schedule of Vahshskaya HPS cascade and in particular Pogunskaya HPS.

Overall costs of the project:

(Million. US dollars) --    850,0-900, 0

From them:

Own means:

The external investments --    850,0-900,0

The Proposal to investors:

Possible forms of co-operation:

Investments attraction in the form of credit

Document ground of the project:

-----------------------------------------------------------------------------

INVESTMENT PROJECT 15

Name of the project: Construction of 72 small Hydroelectric Power Stations.

Title of enterprise: Ministry of energy and industry of the Republic of Tajikistan.

Address: 734024, Republic of Tajikistan, Dushanbe city, 22 Rudaki avn.

Tel.: (992-37) 221-67-97, 221-88-89 fax: (992-37) 221-82-81

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Field of activity: Working out and implementation of unique state policy in the sphere of energy and industry of RT. Foreign economic activity, foreign investments attraction.

The purpose of the project: Provide removed mountainous regions of the republic with electric power, electric power manufacturing for further export to other countries.

The brief description of the project: Construction of small fast-payback HPS for internal and external use.

Overall costs of the project:

(Million. US dollars) --    130,0-1400,0

From them:

Own means:

The external investments --    130,0-1400,0

Capacity -75-80 MW

The Proposal to investors:

Possible forms of co-operation:

Investments attraction in the form of credit

Document ground of the project:

Investment project

Business plan

------------------------------------------------------------------------------

INVESTMENT PROJECT № 16

Name of the project: Restoration of production in Joint Stock Open Company "TRANSFORMATOR".

Name of the enterprise: OPEN JOINT STOCK COMPANY "TRANSFORMATOR".

Address: 735140, Republic of Tajikistan, Khatlon Region,. Kurgan - Tyube town, 1 Gafurova street

Tel.:(10-992-3222) 2-37-53, 2-21-64, fax: (10-992-3222) 2-43-15

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: The manufacture of power transformers and measurement apparatus.

The purpose of the project: The recovery of the manufacture and expansion of output, full loading of existing powers for fulfillment of demand inside the republic, and also export to other countries.

The brief description of the project: Realization of maintenance-rehabilitation activities, replacement of the obsolete equipment, realization of starting-up and adjustment works, acquisition of spares parts, furnishing components, raw and materials which are indispensable for operation of the manufacture.

Total costs of the project:

(million. US dollars) - 10,0

from them:

own means -

the external investments -10,0

payback time (year) - 3

The proposal to the investors

Possible forms of co-operation:

Creation of joint venture including of foreign investors

Documentary ground of the project:

Investment project.

Business - plan.

------------------------------------------------------------------------------

INVESTMENT PROJECT № 17

Name of the project: Completion of the second line of Kurgan-Tube JSC "Transformer"

Characteristic of the enterprise

Name of the enterprise: OPEN JOINT STOCK COMPANY "TRANSFORMATOR".

Address: 735140, Republic of Tajikistan, Khatlon Region,. Kurgan - Tyube town, 1 Gafurova street

Tel.:(10-992-3222) 2-37-53, 2-21-64, fax: (10-992-3222) 2-43-15

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Production of power transformers and measure apparatus

Aim of the project: Assimilation of the new transformer production TM-630, TM-1000.

Brief project description: Completion of construction, installation of new equipment and provide inside market of republic with of power transformers.

Main component of the project: Construction-assembling work, acquisition of equipment, raw and materials, Assembly and launch adjusting work Preparing of personnel

Total value of the project:

(min. USD) - 7,29

including:

internal funds

foreign investment - 7,29

Term of repayment (year) - 3

Proposals to investors:

Possible form of cooperation:

Creation of joint venture, credit

Documentary expediency of the project:

Business plan is on the stage of elaborating

------------------------------------------------------------------------------

INVESTMENT PROJECT № 18

Name of the project: Building of oil-refining factory in Hissar urban settlement of the Republic of Tajikistan.

Name of the enterprise: Limited Enterprise "KNOW - HOW"

Address: 77, Mushfiki str., Dushanbe city, RT, 734025

Теl.: (992-37) 227-35-28.

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Oil products treatment.

Project goal: Building of oil-refining factory.

Brief description of the project: Erection woks, purchasing of equipment. Annual productivity of the factory will make:

- petrole - 7000 t;

- diesel fuel - 20000 t;

- black oil (furnace) - 27000 t.

Total costs of the project:

(million US dollars) - 1,32

of which:

own contributions -

foreign investments - 1,32

recoupment time (year) - 1

Proposal to investors

Possible forms of cooperation:

Attracting investments in the form of a credit:

Documental justification of the project:

Investment project

Business - plan.

------------------------------------------------------------------------------

INVESTMENT PROJECT № 19

Name of the project: Development of gas deposits and creation of gas pipeline systems in the south of Tajikistan

Name of the enterprise: The Ministry of energy end industry of the Republic of Tajikistan.

Address: 734026, Republic of Tajikistan., Dushanbe city, 22 Rudaki avn.

Tel.: (992-37) 221-69-97, 227-26-37,227-42-73, fax: 221-82-81, 227-42-73

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Development and implementation of unique state policy in the sphere of energy of RT, coordination of enterprises activity on development, transference and distribution of power energy of RT. Foreign economic activity, foreign investments attraction.

Purpose of the project: Construction of gas pipe-line on the territory of the Gas deposit "Khoja-Sartez-Sarband".

Brief description of project: It is necessary to purchase and assemble the following equipments: steel fastener, steel pipe of 325, 159 mm of diameter and other material recourses and equipments due to the project for gas pipe line construction

Total costs of the project:

(million. US dollars) - 9,0

from them:

own means

the external investments - 0

term of repayment (year) - 4,7

Proposal to the investors

Possible forms of cooperation low interest credit

------------------------------------------------------------------------------

INVESTMENT PROJECT № 20

Name of the project: Research-prospecting operations in Rengan area, situated in Lenin region of the Republic of Tajikistan

Name of the enterprise: The Ministry of energy end industry of the Republic of Tajikistan.

Address: 734026, Republic of Tajikistan., Dushanbe city, 22 Rudaki avn.

Tel.: (992-37) 221-69-97, 227-26-37, 227-42-73, fax: 221-82-81, 227-42-73

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Type of activity: Development and implementation of unique state policy in the sphere of energy of RT, coordination of enterprises activity on development, transference and distribution of power energy of RT. Foreign economic activity, foreign investments attraction

Brief description of project: The presence of oil and gas structure in Rengan located in Lenin region is confirmed by the complex geological-geophysical documents on Jurassic deposits. Seismic - research operations in volume of 55 linear km. are being conducted. Three deep chinks were drilled with metric area of 13540 m. The structure dimension is: 9x3 km. Perspective resources of free gas is 35 bl. m3. The tentative depth of bedding is 6700 m. It is necessary to provide the supplementary seismic-research measures in volume of 150 linear km to and drill three chinks in depth of 6900 m each ones (one is research, two are prospecting). Annual extraction of gas is 1400 bl. m3

Total costs of the project:

(million. US dollars) - 82,0

from them:

own means - 80,4

the external investments - 1,6

term of repayment (year) - 10

Proposals to the investors:

Possible forms of cooperation: creation of joint-ventures, share participation, issue of licenses to conduct operations, low interest credit.

List of required equipment:

Drilling technology, drilling pipes, chemical reagents and other material resources due project.

------------------------------------------------------------------------------

INVESTMENT PROJECT № 21

Project Name: Rehabilitation of production of technological shop on deeper conversion of oil.

Enterprise Name: Joint-Stock Public Society "Petroleum-bitumen factory".

Address: 735147, RТ, Khatlon oblast, Kolhozabad region.

Теl.: (992-3247) 4-30-03.

Type of activity: Treatment of oil products. Production of bitumen of model МF 40/70, MF 70/130, БИД 60/90, gasoline, diesel oil.

Project Objective: Rehabilitating and increasing production, full usage of the existing power (100 thousand) for satisfaction of demand of the local market of the Republic, as well as export to Afghanistan.

Brief Description of the Project: Running repair-recovery works, replacement of the dated equipment, running testing and commissioning works, purchasing spare parts, constituent parts, raw and materials necessary for the production functioning. Personnel training.

Overall Project Cost:

(Million US dollars) - 1,2

of which:

own funds - 0,2

foreign investment - 1,0

payback time - 2 years

Proposal for Investors: